The following are all a part of a coating inspection sequence Except:

Measurement of coating material quantities to be applied

Measurement of wet film thickness

Make sure you submit a unique essay

Our writers will provide you with an essay sample written from scratch: any topic, any deadline, any instructions.

100% ORIGINAL

Measurement of ambient conditions

Inspection of compressor equipment

QUESTION 2

When working with CML&C, an inspector should be concerned most with:

Delivery, storage and handling

Excavation and bedding

Lifting and positioning

All the above

QUESTION 3

Reviewing pipeline stationing is not a good method for an inspector to verify unit price payment for piping installed.
True
False

QUESTION 4

It is recommended to keep pipe trenches as narrow as practical.

True

False

QUESTION 5

It is recommended that miter-cut joints be prefabricated and inspected before being placed in position.
True
False

QUESTION 6

It is possible to use untreated wood Piles when the entire pile will be permanently below the water table.

True
False

QUESTION 7

The following are common joint bonding problems with water stops Except:

Section misalignment

Open weld at edges

mitered joints

Vertical cut

QUESTION 8

A joint involving a _____ must be miter-cut and bonded.

tee

wye

cross

all of the above

QUESTION 9

The inspector does not have the authority to approve substitution of materials.

True

False

Multiple Choice:

QUESTION 10

The following are examples of trenchless technology Except:

Pipe jacking

Slip-Lining

HDD

None of the above

QUESTION 11

The following are all consider project close-out activities Except:

Punchlist

O&M Manuals

Record Drawings

Monthly pay application

QUESTION 12

Measure concrete slump gives the inspector an indication of the consistency of cement added to a concrete mix.
True
False

QUESTION 13

Minor variations in waterstop cross section should not cause field jointing problems.

True
False

QUESTION 14

An inspector may possess any of the following types of authority, Except:

Actual

Apparent

Limited

All the above

QUESTION 15

Because concrete cures by hydration, it is advisable to have as much water as possible in the mix.
True
False

QUESTION 16

When placing concrete, higher temperatures will slow down hydration
True
False

QUESTION 17

Prior to coating application, evaluation of the surface preparation equipment includes the Following Except:

Compressor air cleanliness

Blast cleaning machine

Abrasive inspection

None of the above

QUESTION 18

Compensation for thermal expansion in buried plastic pipe can be achieved by snaking the line from side to side in the trench.

True
False

QUESTION 19

The following are type of pile bearing Except:

Friction piles

End bearing piles

Compaction piles

Shear bearing piles

QUESTION 20

There is no joint sawing schedule that should be ideal for every job.

True
False

QUESTION 21

Sand should never be used as backfilling for pipeline installation.

True
False

QUESTION 22

In inspecting dry film thickness, we take the average of _____ gauge readings.
5

10

15

20

QUESTION 23

Air entrainment is used in concrete to:

Create a better surface appearance.

Increase the resistance of concrete to freeze-thaw effects.

Strengthen the concrete

Help evaporate excess water from the curing concrete.

QUESTION 24

The most common type of sheet piles is the ______ type.

Concrete

Wood

Steel

Cooper

QUESTION 25

The most important characteristic that the inspector should note about a concrete plant is the __________ of the mixes it produces.

strength

workability

grades

consistency

QUESTION 26

In a group of concrete samples, the strongest will be the one:

Cured underwater for a year

Moist-cured for 3 weeks, then allowed to air dry.

Moist-cured for 3 days, then allowed to air dry.

Cured in the air for a year.

QUESTION 27

Screeding (concrete leveling to proper elevation in the forms) takes place before consolidation.
True
False

QUESTION 28

Which of the following is a major concern when placing concrete:

Consolidation

Drop height

Distance moved after placed in for work.

All of the above.

QUESTION 29

Because of the reinforcement strength in concrete pipe, point load lifting and placement of pipe is not a concern for an inspector.

True
False

QUESTION 30

In reinforced concrete, it is acceptable to have light rust on the surface of the steel.

True
False