Category: Uncategorized
Multiple Accounting Problems
A study wants to examine the relationship between student anxiety for an exam
Regression Problem – Ace Gadgets Paper
ACC – Bulldog Appliances uses the periodic inventory system
ACC – Bulldog Appliances uses the periodic inventory system
Bulldog Appliances uses the periodic inventory system. Details regarding the inventoryof appliances at September 1, 2011, purchases invoices during the next 12 months, and the inventory count at August 31, 2012, are summarized as follows:
Purchases Invoices
Model Inventory,
September 1 1st 2nd 3rd Inventory Count,
August 31
AZ09 __ 4 at $ 32 4 at $ 35 4 at $ 38 5
GA85 8 at $ 88 4 at $ 79 3 at $ 85 6 at $ 92 7
HI71 3 at 75 3 at 65 15 at 68 9 at 70 5
KS32 7 at 242 6 at 250 5 at 260 10 at 259 9
MS17 12 at 80 10 at 82 16 at 89 16 at 90 13
ND52 2 at 108 2 at 110 3 at 128 3 at 130 5
WV63 5 at 160 4 at 170 4 at 175 7 at 180 8
Instructions
1. Determine the cost of the inventory on August 31, 2012, by the first-in, first-out method.Present data in columnar form, using the following headings:
Model Quantity Unit Cost Total Cost
If the inventory of a particular model comprises one entire purchase plus a portionof another purchase acquired at a different unit cost, use a separate line for eachpurchase.
2. Determine the cost of the inventory on August 31, 2012, by the last-in, first-out method,following the procedures indicated in (1).
3. Determine the cost of the inventory on August 31, 2012, by the average cost method,using the columnar headings indicated in (1).
4. Discuss which method (FIFO or LIFO) would be preferred for income taxpurposes in periods of (a) rising prices and (b) declining prices.
uop cmgt410 week 5 [10- to 12-slide Microsoft PowerPoint presentation of the entire Learning Team Project
|
Learning Team Microsoft® PowerPoint® Finalized Presentation |
Prepare and Submit a 10- to 12-slideMicrosoft® PowerPoint® presentation of the entire Learning Team Project, as completed in Weeks Two, Three, Four, and Five. Include detailed speaker notes.Refer to the Feedback Template for the Week 5 Team Presentation, in the course materials folder and below. |
Carly Riccardi and her mother Nancy own and operate FreezeTime, Inc
Carly Riccardi and her mother Nancy own and operate FreezeTime, Inc
Carly Riccardi and her mother Nancy own and operate FreezeTime, Inc., a company specializing in freeze-drying flowers from clients ‘memorable events, such as proms and weddings. The company not only freezes the flowers, but also presents them in a variety of display packages. Each of these packages includes materials such as glass and frames that FreezeTime purchases from local suppliers. In addition to supplies for display, the company purchases office supplies and packaging materials from several vendors. FreezeTime uses a low-end accounting software package to prepare documents and reports. As employees note a need for supplies and materials, they inform Carly or Nancy, who act as office manager and company accountant. Either Carly or Nancy enters order information into the accounting system and creates a purchase order that they fax to the supplier. Occasionally, Carly or Nancy will also call the supplier if there is something special about the product ordered. When ordered materials and supplies arrive at FreezeTime’s small factory, either Carly or Nancy checks the goods received against a copy of the purchase order and enters the new inventory into the computer system Nancy pays bills twice each month, on the first and the fifteenth. She checks the computer system for invoices outstanding, and verifies that the goods have been received. She then enters any information needed to produce printed checks from the accounting system. FreezeTime mails checks and printed remittance advices (portions of the vendor bill to be returned) to suppliers.
Requirements:
1) Prepare a systems flowchart for FreezeTime’spurchase and payment process.
Nile Foods’ stock has a beta of 1.4, while Elbe Eateries’ stock has a beta of 0.7
Nile Foods’ stock has a beta of 1.4, while Elbe Eateries’ stock has a beta of 0.7
1. Nile Foods' stock has a beta of 1.4, while Elbe Eateries' stock has a beta of 0.7. Assume that the risk-free rate, rRF, is 5.5% and the market risk premium, (rM - rRF), equals 4%. Which of the following statements is CORRECT?
Answer
Since Nile's beta is twice that of Elbe's, its required rate of return will also be twice that of Elbe's.
If the risk-free rate increases but the market risk premium remains unchanged, the required return will increase for both stocks but the increase will be larger for Nile since it has a higher beta.
If the market risk premium increases but the risk-free rate remains unchanged, Nile's required return will increase because it has a beta greater than 1.0 but Elbe's will decline because it has a beta less than 1.0.
If the market risk premium decreases but the risk-free rate remains unchanged, Nile's required return will decrease because it has a beta greater than 1.0 and Elbe's will also decrease, and by more than Nile's because it has a beta less than 1.0.
If the risk-free rate increases while the market risk premium remains constant, then the required return on an average stock will increase.
3 points
Question 2
1.
Other things held constant, if the expected inflation rate decreases and investors also become more risk averse, the Security Market Line would shift
Answer
down and have a less steep slope.
up and have a less steep slope.
up and keep the same slope.
down and keep the same slope.
down and have a steeper slope.
3 points
Question 3
1.
Which of the following statements is CORRECT?
Answer
The constant growth model takes into consideration the capital gains earned on a stock.
It is appropriate to use the constant growth model to estimate stock value even if the growth rate is never expected to become constant.
Two firms with the same expected dividend and growth rate must also have the same stock price.
If a stock has a required rate of return rs = 12%, and if its dividend is expected to grow at a constant rate of 5%, this implies that the stock's dividend yield is also 5%.
The price of a stock is the present value of all expected future dividends, discounted at the dividend growth rate.
3 points
Question 4
1.
The risk-free rate is 6%; Stock A has a beta of 1.0; Stock B has a beta of 2.0, and the market risk premium, rM - rRF, is positive. Which of the following statements is correct?
Answer
Stock B's required rate of return is twice that of Stock A.
If Stock A's required return is 11%, the market risk premium is 5%.
If Stock B's required return is 11%, the market risk premium is 5%.
If the risk-free rate increases but the market risk premium stays unchanged, Stock B's required return will increase by more than Stock A's.
If the risk-free rate remains constant but the market risk premium increases, Stock A's required return will increase by more than Stock A's.
3 points
Question 5
1.
Which of the following statements is CORRECT?
Answer
If you plotted the returns of a given stock against those of the market, and you found that the slope of the regression line was negative, the CAPM would indicate that the required rate of return on the stock should be less than the risk-free rate for a well-diversified investor, assuming that investors in the market expect the observed relationship to continue on into the future.
The slope of the SML is determined by the value of beta.
The SML shows the relationship between companies' required returns and their diversifiable risks. The slope and intercept of this line cannot be influenced by a firm's managers, but the position of the company on the line can be influenced by managers.
If investors become less risk averse, the slope of the Security Market Line will increase.
If a company increases its use of debt, this is likely to cause the slope of its SML to increase, indicating a higher required return on the stock.
business managment – In resource planning, one of the issues that needs to be considered is:
business managment – In resource planning, one of the issues that needs to be considered is:
In resource planning, one of the issues that needs to be considered is:
Question 1 answers
a. Staff empowerment
b. Technical requirements of the project
c. Theory X management principles
d. Theory Y management principles
Question 2 text Question 2 1 points Save
A modern view in Human Resource Management is that positive motivation results from an opportunity to achieve and experience self-actualization.
Question 2 answers
True
False
Question 3 text Question 3 1 points Save
The critical path:
Question 3 answers
a. Provides the duration of a project
b. Has the shortest duration on a project
c. Is the most expensive path to implement
d. Contains the project's most significant tasks
Question 4 text Question 4 1 points Save
If review of a project's status indicates that EV = $400, AC = $400, and PV = $500, the project is:
Question 4 answers
a. On budget, behind schedule
b. On budget, ahead of schedule
c. Over budget, behind schedule
d. Over budget, ahead of schedule
Question 5 text Question 5 1 points Save
When we have objective data on the probability of an event, we are involved with decision making under certainty.
Question 5 answers
True
False
Question 6 text Question 6 1 points Save
The astute project manager typically uses only one management style in order not to confuse his/her teammates.
Question 6 answers
True
False
Question 7 text Question 7 1 points Save
Under what conditions may a project manager accept a change request?
Question 7 answers
a. If the request has no effect on project objectives, deadlines, or resources
b. If the request has no effect on project objectives, although it has effects on deadlines and resources
c. If the request is coming from a valued customer
d. If the request is from the Chief Executive Officer
Question 8 text Question 8 1 points Save
Needs recognition is the first stage of the needs-requirement life cycle.
Question 8 answers
True
False
Question 9 text Question 9 1 points Save
Which of the following is a characteristic of an effective reporting system?
Question 9 answers
a. SMART
b. KISS
c. MBO
d. LOWBALLING
Question 10 text Question 10 1 points Save
Milestones, like tasks, consume resources.
Question 10 answers
True
False
Question 11 text Question 11 1 points Save
Internal Rate of Return (IRR) is the discount rate that sets the present value of cash outflow equal to the present value of cash inflow.
Question 11 answers
True
False
Question 12 text Question 12 1 points Save
The bottom-most level of the WBS -- the level at which project budget and schedule data are captured -- is called:
Question 12 answers
a. Work package
b. Code of accounts
c. Budget baseline
d. Change control level
Question 13 text Question 13 1 points Save
Confidence in the accuracy of a cost estimate increases when top-down and bottom-up estimates converge.
Question 13 answers
True
False
Question 14 text Question 14 1 points Save
A tool that graphically shows cost variance is:
Question 14 answers
a. A chart of accounts
b. A code of accounts
c. A histogram (also called a resource loading chart)
d. A cumulative cost curve (also called S-curve)
Question 15 text Question 15 1 points Save
Concurrent engineering involves overlapping tasks and phases to accelerate a project's schedule.
Question 15 answers
True
False
Question 16 text Question 16 1 points Save
Configuration management is a:
Question 16 answers
a. Methodology for working closely with customers by developing and updating requirements for faster response to changing customer needs
b. Methodology for ensuring that requirements evolve with evolving customer requirements
c. Methodology for specifying requirements at the outset and for controlling very tightly any changes to them
d. Methodology for specifying requirements at the outset and for facilitating any changes to them with minimum customer input
Question 17 text Question 17 1 points Save
A key objective of change control in configuration management is to keep track of actions taken in response to change requests.
Question 17 answers
True
False
Question 18 text Question 18 1 points Save
Good functional requirements
Question 18 answers
a. Describe how the deliverable should be developed
b. Provide detailed technical insights into what the deliverable will do
c. Describe what the deliverable looks like and what it should do
d. Are created after development of the technical specifications
Question 19 text Question 19 1 points Save
A challenge of the matrix project organization is that:
Question 19 answers
a. Team members are full of ego
b. Team members are selected from the same functional area
c. Team members have divided loyalties
d. It enables functional managers to provide career guidance to their workers
Question 20 text Question 20 1 points Save
Bottom-up estimates:
Question 20 answers
a. Are based on historical trends
b. Can be derived from the WBS
c. Must employ Monte Carlo simulation
d. a and c
Question 21 text Question 21 1 points Save
A major strength of task Gantt charts is that they can:
Question 21 answers
a. Offer a sophisticated model of a project
b. Show how many resources will be used on the project
c. Show the interdependencies of tasks
d. Show actual versus planned schedule status
Question 22 text Question 22 1 points Save
There is a definite link between the level of risk an enterprise encounters and project time frame.
Question 22 answers
True
False
Question 23 text Question 23 1 points Save
If EV = $300, AC = $400, and the project budget is $1,000, what is the estimated final cost of the project (this is known as EAC, estimate at complete)?
Question 23 answers
a. $750
b. $1,000
c. $1,250
d. $1,333
Question 24 text Question 24 1 points Save
Rapid prototyping is a methodology for:
Question 24 answers
a. Specifying requirements at the outset and for controlling very tightly any changes to them
b. Specifying requirements at the outset and for facilitating later changes to them with minimum customer in put
c. Triggering early warning of unauthorized changes to the original prototype to enable project management to take remedial actions
d. Working closely with customers by creating and updating prototypes that respond to customer input
Question 25 text Question 25 1 points Save
Using working time or elapsed time to calculate the time it will take to complete a task produces the same results.
Question 25 answers
True
False
Question 26 text Question 26 1 points Save
Under rapid prototyping (also called application prototyping), the customer actually sees and works with the deliverable as it evolves.
Question 26 answers
True
False
Question 27 text Question 27 1 points Save
Top-down estimates (also called parametric estimates):
Question 27 answers
a. Are based on historical trends
b. Can be derived from the WBS
c. Can be determined by analyzing work packages
d. Provide accurate assessments of project costs
Question 28 text Question 28 1 points Save
Ensuring a one-to-one correspondence between specification items and general design items is a feature of:
Question 28 answers
a. Scope statement definition
b. WBS construction
c. Rapid prototyping
d. Configuration management
Question 29 text Question 29 1 points Save
Which of the following methods involves performing tasks in parallel?
Question 29 answers
a. Crashing
b. Fast tracking
c. Leveling
d. Hammocking
Question 30 text Question 30 1 points Save
If you want to shorten the length of a project, you must:
Question 30 answers
a. Shorten the critical path
b. Shorten the free float
c. Spend more money
d. Cut back on the features you plan to deliver
Question 31 text Question 31 1 points Save
Functional requirements provide us with detailed technical specifications.
Question 31 answers
True
False
Question 32 text Question 32 1 points Save
If the latest time you can start a task is five hours into the project, and the earliest time is three and a half hours into the project, how much slack (also called float) does the task have?
Question 32 answers
a. 0.5 hours
b. 1.5 hours
c. 2.5 hours
d. 8.5 hours
Question 33 text Question 33 1 points Save
The type of management whose focus is on activities whose variances lie outside the acceptable range is:
Question 33 answers
a. Management by Objectives
b. Management by Exception
c. Management by Walking Around
d. Management by Control Limits
Question 34 text Question 34 1 points Save
Which of the following is a scope planning tool?
Question 34 answers
a. Benefit/cost analysis
b. WBS
c. Earned Value analysis
d. Fast tracking
Question 35 text Question 35 1 points Save
Which of the following is an example of a project?
Question 35 answers
a. Maintaining e-mail addresses
b. Capacity planning
c. Submitting travel and expense reports
d. Sending monthly reports to top management
Question 36 text Question 36 1 points Save
The poor man's hierarchy is a method for:
Question 36 answers
a. Project estimation
b. Project scheduling
c. WBS construction
d. Project selection
Question 37 text Question 37 1 points Save
In project management, the level of uncertainty plays a major role in determining the adequacy of a project plan.
Question 37 answers
True
False
Question 38 text Question 38 1 points Save
An objective of prototyping is to minimize life-cycle cost.
Question 38 answers
True
False
Question 39 text Question 39 1 points Save
A project can be terminated prematurely because the original objectives may no longer be valid.
Question 39 answers
True
False
Question 40 text Question 40 1 points Save
Scope creep means:
Question 40 answers
a. Needs emergence and identification
b. Uncontrolled changes to a project's requirements during project execution
c. Migration of project needs to requirements
d. Imprecise scope statement
Question 41 text Question 41 1 points Save
Which of the following is not an activity carried out during project closeout?
Question 41 answers
a. Reassignment of project staff
b. Preparation of the project's baseline
c. Reassignment of material resources
d. Preparation of user manuals
Question 42 text Question 42 1 points Save
Which of the following shows resource allocation over time?
Question 42 answers
a. Resource Gantt chart
b. Resource matrix
c. S-Curve
d. Resource leveling
Question 43 text Question 43 1 points Save
The purpose of mid-project evaluation is:
Question 43 answers
a. Continual monitoring of budget and estimates
b. To focus on achievement of individual element of the project plan
c. To determine whether the original objectives are still relevant
d. To re-baseline the project budget
Question 44 text Question 44 1 points Save
An effective project manager must:
Question 44 answers
a. Tell his team members what to do
b. Be the most capable person on the team technically
c. Be focused on achieving results
d. Not trust his team members to achieve results without his personal attention to detail
Question 45 text Question 45 1 points Save
A laissez-faire management style may lead to a ship without rudder syndrome.
Question 45 answers
True
False
Question 46 text Question 46 1 points Save
When crashing a project, we typically choose critical path tasks whose costs of crashing are highest.
Question 46 answers
True
False
Question 47 text Question 47 1 points Save
According to PMI, a WBS should focus on
Question 47 answers
a. Tasks
b. Deliverables
c. Interrelationships among activities
d. Cost of the project
Question 48 text Question 48 1 points Save
The Theory X approach to managing workers is a classic example of a top-down view of how people should be managed.
Question 48 answers
True
False
Question 49 text Question 49 1 points Save
Structured Walk-Through is a methodology used in:
Question 49 answers
a. PERT
b. GERT
c. VERT
d. Project Evaluation
Question 50 text Question 50 1 points Save
A four step risk assessment process reflecting standard risk management good practice consists of:
Question 50 answers
a. Risk identification, Risk deflection, Risk impact analysis, Risk monitoring and control
b. Risk acceptance, Risk impact analysis, Risk response planning, Risk monitoring and control
c. Risk deflection, Contingency planning, Risk impact analysis, Risk monitoring and control
d. Risk identification, Risk impact analysis, Risk response planning, Risk monitoring and control
Question 51 text Question 51 1 points Save
A project team structure that closely reflects the physical structure of the deliverable is known as:
Question 51 answers
a. Egoless
b. Specialty
c. Surgical
d. Isomorphic
Question 52 text Question 52 1 points Save
Which of the following is an elapsed time task?
Question 52 answers
a. Paint is drying
b. A painter paints the wall
c. Software is being written
d. A sandwich is being made
Question 53 text Question 53 1 points Save
The resource planning tool that enables us to identify who we need to carry out what tasks is called:
Question 53 answers
a. A resource Gantt chart
b. A resource matrix (also called the responsibility chart)
c. A resource ogive
d. A resource loading chart (also called a resource histogram)
Question 54 text Question 54 1 points Save
A key characteristic of an effective project team is that:
Question 54 answers
a. Members have graduate degrees in project management
b. Members come from the same professional background
c. Members see themselves as stakeholders in the project
d. Members adhere to a prescribed pecking order
Question 55 text Question 55 1 points Save
In risk management, insurance is an example of:
Question 55 answers
a. Risk avoidance
b. Risk deflection
c. Risk acceptance
d. Contingency planning
Question 56 text Question 56 1 points Save
What is the function of a change control board (CCB) in configuration management?
Question 56 answers
a. To assess the management impacts of change requests
b. To initiate changes needed on the project
c. To focus on the technical implication of change requests
d. To approve change requests coming from senior management
Question 57 text Question 57 1 points Save
Definitive estimates are generally derived from:
Question 57 answers
a. Bottom-up estimates
b. Top-down estimates
c. Expert judgment cost estimates
d. Order of magnitude estimates
Question 58 text Question 58 1 points Save
An autocratic management style:
Question 58 answers
a. Is effective in most project management situations
b. Is effective in highly routine efforts
c. Is effective in high flux, state-of-the-art projects
d. Will lead to the tyranny of the majority
Question 59 text Question 59 1 points Save
A key weakness of the Benefit-Cost ratio project selection mechanism is that:
Question 59 answers
a. It only focuses on things that can be measured
b. It takes time frame into consideration
c. It is too much based on subjective judgment
d. It does not entail prioritizing
Question 60 text Question 60 1 points Save
A work package is to be found at the summary level of the WBS.
Question 60 answers
True
False
davenport econ625 week 4 quiz
·
|
Which U.S. agency is responsible for preventing anti-competitive conduct? |
· Question 2
3.5 out of 3.5 points
|
What criterion developed by the DOJ is used to identify all potential
competitors within the market? |
||||
· Question 3
3.5 out of 3.5 points
|
Which of the following is not a characteristic of substitute products X and Y? |
||||
· Question 4
3.5 out of 3.5 points
|
What empirical method generally is used to measure the degree to which products substitute for each other? |
||||
· Question 5
3.5 out of 3.5 points
|
What is defined by the number and size distribution of the firms in a
market? |
||||
· Question 6
3.5 out of 3.5 points
|
What term refers to situations in which firms can sustain prices in excess of those that would arise in a non-cooperative single-shot price or quantity-setting game? |
||||
· Question 7
3.5 out of 3.5 points
|
What type of cooperation-inducing strategy is defined as one so compelling that that a firm would expect all other firms to adopt it? |
||||
· Question 8
3.5 out of 3.5 points
|
Which of the following would not help facilitate coordination of
pricing across firms in an industry? |
||||
· Question 9
3.5 out of 3.5 points
|
Why might a firm not be able to react quickly to competitors’ pricing moves? |
||||
· Question 10
3.5 out of 3.5 points
|
Why do price-sensitive buyers tend to harm cooperative pricing in a market? |
||||